top of page
W E S T G R E E N P L A C E
P R O J E C T
C L I E N T
C O N S U L T A N T
A D D R E S S
P E R I O D
V A L U E
West Green Place
HG Construction Ltd
Kut Partnership LLP
Keston Road, London, N17 6PN
10 Months
£1,500,000
T4M&E Ltd were contracted to do the mechanical install to 107 flats and 16 town houses.
​
T4 M&E Ltd built the centralised plantroom. All the flats have individual HIU’s for hot water and heating, an Mechanical Ventilation Heat recovery unit per plot, Underfloor Heating , Hot & Cold water, Soil pipes and waste Rainwater.
The Houses are fitted with boilers with Cylinders for hot water. Hot & Cold water to Bathrooms and Kitchens, utilising plastic Pipework Hep2o. T4 were also responsible for soil & waste and Rainwaters pipework
1/13
bottom of page